Sub Basin 32b Conveyance Upgrades

Project ID: 
SW0130
Project Type:
Storm
Project Status: 
Planning/Design

SW0130 Project Location​​Project Status

To help keep area residents informed of our construction progress, we will post project updates to this site on a regular basis. Click here to see status updates.

Project Details/Neighborhood 

  • Along SE 72nd Street, east of West Mercer Way

​Background

Computer modeling was completed to investigate potential capacity issues for the storm drainage system.  The modeling confirmed that the current 18-inch storm pipe is undersized and does not have capacity for high intensity, short duration storm events.  During such events, there is a potential for minor localized street ponding.

Description

Construct an 18-inch storm pipe parallel to the existing pipe along SE 72nd Street to increase system capacity.  Catch basins will be added at the intersection of SE 72nd Street and West Mercer Way to improve collection of roadway runoff.

Project Timeline

Planning/Design: Q3 2023 – Q1 2024

Construction: Q2 2024 – Q3 2024

Estimated Budget

$189,000

Contact

Elayne Grueber, P.E., Capital Project Manager, elayne.grueber@mercerisland.gov

www.mercerisland.gov/SW0130

 

 

 
Status Updates

February 2024

City Staff are reviewing design. 

December 2023

The design phase is nearly completed, with the consultant submitting final design plans in December for City staff review.

October 2023
The 90 percent design is expected by the end of October. 

Files: